Statoil celebrates Mdalasini-1 – Block-2 eighth success The Norwegian national oil company (NOC) Statoil and its partner the […]
Read morePetronas plans Malaysia Block SK 316 second platform The Malaysia national oil company (NOC) Petronas is qualifying the […]
Read moreTags: 2P reserves, Bintulu in the Sarawak province, Central Luconia Province Sarawak Basin, central processing platform (CPP), competitive front end engineering and design FEED, consortium French engineering company Technip and Malaysia Marine and Heavy Engineering Sdn (MMHE), engineering companies and contractors to be invited to bid, EPC contract, FEED contract, Kasawari gas field offshore the Sarawak Province in Malaysia, Kasawari phase-1 project, Kasawari Phase-2, Kasawari-1 drilling, Kasawari-2 central processing platform, Linked-bridge central gathering and flare tower platform, liquefied natural gas (LNG) train, LNG train, Malaysia national oil company (NOC) Petronas, natural gas and condensate prolific Block SK 316, natural gas reserves, NC3 and the NC8SW-1 discovery wells, non-associated gas in Malaysia, offshore part of the Ninth Bintulu LNG Train project, Platform Block SK 316, slots wellhead platform, South China Sea, Technip conceptual study, topsides
Posted in One day - One Project | 5 Comments
Posted in One day - One Project | 5 Comments
Gazprom and Shell to add third LNG train at Sakhalin II Gazprom and the Royal-Dutch Shell (Shell) met […]
Read moreTags: Baltic LNG, Booster station, Call for Tender, crude oil, front end engineering and design (FEED) work, Gazprom, greenfield Vladivostock LNG project, liquefied natural gas (LNG) train, Memorandum of Understanding (MOU), Mitsubishi Corporation (Mitsubishi), Mitsui & Co (Mitsui), Moscow, offshore oil and gas production platforms, oil and gas production asset, oil export terminal, Onshore pipelines system, Onshore processing facilities, President Putin, Prigorodnoye plant, Production Sharing Agreement (PSA), Royal-Dutch Shell (Shell), Russia, Russian Federation Government, Sakhalin Energy joint venture, Sakhalin II expansion project, Sakhalin II third LNG train project, Sakhalin Island LNG plants, shipment, Sotchi, trains LNG Plant
Posted in One day - One Project | 2 Comments
Posted in One day - One Project | 2 Comments
Petrofac contracted as Block R Development Operator The London-based junior company Ophir Energy plc (Ophir) has appointed the […]
Read moreTags: 2 C reserves, Africa, Belli, Bioko Island, Block R, Block R offshore Equatorial Guinea, contractors, conventional design, drilled out, engineering company, Equatorial Guinea, Estrella de Mar, Europe, Exploration and Production, FEED, FEED contract, FID, Field Development Plan, Final Investment Decision, fLNG, FLNG vessel, floating LNG (FLNG) vessel, Fortuna, Fortuna East, Fortuna West, Front End Engineering and Design (FEED) contract, Gabon, gas, gas field discoveries, GEPetrol, Ghana., Kenya, liquefied natural gas (LNG) train, LNG, LNG export facilities, LNG train, London, Lykos, Marathon, Midstream, National Oil Company, natural gas, natural gas reserves, Niger Delta, NOC, offshore platform, oil and gas reserves, Operator, Ophir, Ophir Energy plc, Oreja Marina, Perth, Petrofac, Punta Europe, South Korea, subsea gas pipeline, Tanzania, Tonel, UK, upstream, USA, Viscata, water depth, West Coast of Africa.
Posted in One day - One Project | Leave a comment
Posted in One day - One Project | Leave a comment
Chevron additional reserves credit Gorgon Expansion While Chevron continues to harvest natural gas discoveries in the Greater Gorgon […]
Read moreTags: Australia, Barrow island, CAPEX, capital expenditure, carbon dioxide injection, Carnarvon Basin, Carnarvon Basin offshore, Chandon, Chevron, Chrysaor, Chubu, Chubu Electric Power, completion, condensate, Dampier-to-Bunbury natural gas pipeline, Dionysus, Elfin-1 well, Engineering, Engineering Procurement and Construction, EPC, EPCM, EPCM contract, Eurytion, Exmouth, Exmouth Plateau area, Exploration & Production, Export gas pipeline, ExxonMobil, FEED, feedstock, FID, final investment decision (FID), Front End Engineering and Design (FEED), gas central processing facility (CPF), gas pipeline, Gas treatment, Geryon, Gorgon, Gorgon Expansion project, Gorgon LNG project, Gorgon LNG project first phase, Gorgon Phase 1 project, Greater Gorgon area, Greater Gorgon area offshore, Greater Gorgon area offshore Western Australia, Halliburton, Hatch Associates Pty Ltd, Jansz/lo, Japan - Clough, JGC, joint venture, KBR, KBR joint venture, Kellog Joint Venture Gorgon (KJV-G) team, KJV-G, KJV-G team, liquefied natural gas (LNG) train, LNG Carriers, LNG train, low sulfur, Maenad, Market Leadership, Midstream, natural gas, offshore, Offshore technology, Offsites and Utilities, ogp projects, OGP projects pursuit, Oil & Gas, Oil & Gas and Petrochemical, Oil & Gas and Petrochemical capital expenditures, Oil & Gas and Petrochemical Contract, Oil & Gas and Petrochemical Project, oil and gas, Oil news, Oil&Gas, Onslow, Operator, Orthrus, Osaka Gas, Pilbara coast, Pinhoe-1 and Arnhem-1 wells, pipelines, pre-FEED, pre-front end engineering and design (pre-FEED), procurement and construction management (EPCM), Project Feasibility study, Shell, subsea technologies, Tokyo Gas, upstream, USA, West Tryal Rocks fields, Western Australia
Posted in One day - One News, One day - One Project | Leave a comment
Posted in One day - One News, One day - One Project | Leave a comment
Petronas to decide soon on Bintulu LNG Expansion As part of Malaysia oil and gas and petrochemical strategic […]
Read moreTags: 9 LNG train project, Acid gas removal, barrel oil equivalent (boe), Berangan-1, Bidara, Bintulu, Bintulu 9 LNG train, Bintulu 9 LNG train project, Bintulu LNG complex, Bintulu LNG facility, BOE, Business model for oil & gas and petrochemical industry suppliers, CAPEX, capital expenditure, Chiyoda, completion, construction and commissioning (EPCC) contract, crude oil, depletion of maturing fields, downstream, Engineering, Engineering Procurement and Construction, enhanced oil recovery (EOR), enhanced oil recovery (EOR) techniques, EPC, EPCC contract, EPCC contractor, Ethylene, Exploration & Production, exploration and fields development projects, export, exported LNG, FEED, FEED contracts, feedstock, FID, final investments decision, Fractionation unit, Front End Engineering and Design (FEED), front end engineering and design (FEED) contracts, Gambir RDR, gas, Gas dehydration unit, gas pipeline, Gas receiving facilities, hydrocarbon value chain, JGC, joint venture, Kasawari, Kluang North-2, Kurma Manis-1, liquefied natural gas (LNG) train, liquefied natural gas (LNG) train project, Liquifaction unit, LNG, LNG train, Malaysia, Malaysia oil and gas and petrochemical strategic development program, Malaysian RHB Research Institute, Market Leadership, maturing fields, Mercury removal unit, Midstream, National Oil Company, natural gas, new regasification LNG terminal, offshore, Offshore technology, ogp projects, OGP projects pursuit, Oil & Gas, Oil & Gas and Petrochemical, Oil & Gas and Petrochemical capital expenditures, Oil & Gas and Petrochemical Contract, Oil & Gas and Petrochemical Project, oil and gas, oil and gas and petrochemical sector., oil and gas production capacities, Oil news, Oil&Gas, Olefins, Petrochemical, petrochemical complex, Petrochemical projects EPC contracts, petrochemical sector, Petronas, Petronas LNG 9Sdn Bhd, pipelines, Procurement, Project Feasibility study, recoverable reserves, refineries, Saipem, Sarawak province, Shell, South Sudan, South Sudan production and export, storage, Strategic plan, Sudan, Tembakau-1, Tukau Timur Deep-1, upstream
Posted in One day - One News, One day - One Project | Leave a comment
Posted in One day - One News, One day - One Project | Leave a comment