
full field development
Adma-Opco call for technical bid on Al-Nasr Full Field Abu Dhabi Marine Operating Company (Adma-Opco) published the deadlines for the engineering companies to submit their technical offers for the Al-Nasr Full Field Development project offshore Abu Dhabi in the United Arab Emirates (UAE). As Al-Nasr Full Field Development project, Adma-Opco intents to proceed to the second […]
Fluor completed FEED work on Al-Nasr Phase two The Abu Dhabi Marine Operating Company (Adma-Opco) is currently preparing the evaluation of the technical bids to be submitted on Q2 2013 for the engineering, procurement and construction (EPC) packages of the Al-Nasr Full Field Development project offshore Abu Dhabi. Adma-Opco is a joint venture between the local Abu […]
Petronas to award Angsi CEOR vessel EPC contracts The Malaysian national oil company Petronas is preparing the call for tender of the topsides and vessel conversion package for the Angsi chemical enhanced oil recovery (CEOR) vessel planned to be used to boost Angsi oil and gas production by an incremental 20%. This Angsi CEOR vessel will […]
BP to develop Khazzan and Makarem in phase 1 BP revised significantly upward its capital expenditure in Oman Full Field Development project from $15 billion to $24 billion. Discovered in the 1990s, the huge reserves of natural gas in Center Oman have been left undeveloped because of the complexity and the potential costs related to […]
BP to invest $15 billion to develop Oman tight gas BP’s Khazzan tight gas project in Block 61 is one of the company’s top five upstream projects globally. BP’s Khazzan project is also the first and largest of its kind in the Middle East. In January 2007 BP signed a major exploration and production sharing agreement with […]