
Front End Engineering and Design (FEED)
$20 billion Petronas RAPID project calls for partners The proposed Petronas Refinery & Petrochemical Integrated Development (RAPID) complex in Pengerang, Johor, Malaysia, is so far the largest liquid-based greenfield downstream undertaken in Malaysia. It will have a 300,000 barrels per day refinery to supply the petrochemical complex, to produce a host of refined petroleum products, including gasoline […]
Definition Long lead item refers to the equipment, product or system that is identified at the earliest stage of a project to have a delivery time long enough to affect directly the overall lead time of the project. Comments The long lead items are common in the oil & gas and petrochemical industry because of […]
Petronas Floating LNG awarded to Technip-Daewoo June 5th, 2012 – Technip-Daewoo Consortium has been awarded by Petronas a $2 billion contract for a Floating LNG (FLNG) unit in Malaysia Technip created a consortium with Daewoo Shipbuilding & Marine Engineering (DSME) Co. Ltd., the Technip-Daewoo Consortium (TDC). Technip-Daewoo Consortium (TDC) was awarded by Petronas Floating LNG 1 (Labuan) Ltd, […]
Doris to work on Maersk Chissonga FEED Maersk Oil (Maersk) , a fully owned subsidiary of A.P. Møller – Mærsk A/S operates the Block 16, which includes the Chissonga discovery. Chissonga is located in the Lower Congo Basin some 138 kilometres offshore Angola in water depths 1,500 meters. In 2011, Maersk Oil acquired the 15% interest […]
With Leviathan Noble turns Israel into gas exporter In 2009, Israel’s exploration partner Noble Energy discovered the Tamar field in the Levantine Basin, some 50 miles west of Israel’s port of Haifa and with an estimated 8.3 tcf (trillion cubic feet) of highest-quality natural gas. Tamar was the world’s largest gas discovery in 2009. Then, […]
Saudi Arabia to switch on Power Generation from Gas With oil price running steadily around $100 per barrel, the use of crude oil to feed Power Generation appeared more and more as a luxurious solution. Saudi Aramco launched a vast exploration and production campaign to identify all potential gas fields to substitute oil. As a […]
Gas prices and high costs dictate to rethink Shtokman The foreseen capital expenditure for the Shtokman gas field development came up from first estimated $15 billion to $30-40 billion. This costs escalation is resulting from multiple factors including the combined target to produce 50/50 natural gas and LNG. This goal appeared to have a great impact on […]
Statoil, ExxonMobil and ConocoPhillips rename Luva project into Aasta Hansteen During the concept selection Statoil estimated the development capital expenditure in the Aasta Hansteen field (formerly named Luva) at some $5.6 billion (NOK 34 billion). With a total hull weight of 45,000 ton, a length of 193 meters and a draught of 170 meters, the Aasta […]